Estimate maker for construction companies

Price a project stage by stage. List the work, the materials and the trades involved, and send a detailed estimate that shows the client exactly where the money goes.

4.9/5 from 3,500+ reviews

Checklist

What to include on a construction estimate

Everything below has its own field in the editor above. Fill it in once and it's on every estimate.

  • Your company details and registration or license number
  • The project name and site address
  • The scope and the stages of the work
  • Labor, materials and subcontracted work per stage
  • Payment schedule, retention and validity

How it works

How to make a construction estimate

  1. Add your details

    Your business, logo and the client. Once you sign in, they're saved for next time.

  2. Price the job

    Add the work and materials. Totals, tax and discounts are calculated for you.

  3. Send it and get the yes

    Download a professional PDF. Once it's accepted, turn it into an invoice in one tap.

Templates

Choose a template that fits your business

Dozens of professional designs. Add your logo and brand color, and switch any time.

What construction companies usually quote for

Save the things you quote often as items once, and add them to any estimate in a click.

  • Site preparation and groundwork
  • Labor by trade
  • Building materials
  • Subcontractor work
  • Equipment and machinery hire

Quoting tips for construction companies

  • Break the estimate into stages that match your payment schedule
  • List exclusions, so it's clear what's not included
  • Add a contingency line for the unknowns
  • Reference the drawings or specification the price is based on

FAQ

Frequently asked questions

How detailed should a construction estimate be?

Detailed enough that the client can compare it with other bids: the stages, the main materials, labor per trade and subcontracted work. A single lump sum is harder to approve and harder to defend when something changes.

Should a construction estimate include a contingency?

Many do, often 5 to 10 percent, for things that only show up once work starts. Show it as its own line and explain when it's used, so the client trusts it.

What should I exclude from a construction estimate?

Anything you're not pricing: permits, design work, furniture, landscaping or unforeseen ground conditions. A short list of exclusions prevents most disputes later.